Skip to content
Sign in
An orange track drill on a bench of broken rock above a lake, with snow-capped mountains beyond
Rig on the bench · Photo Rocking P Blasting

Operations software for drilling and blasting

Each operator gets its own instance, with scheduling, drill logs, blast reports and billing kept in one place.

Running on Bergbor

  • Pop Rocks · Rocking P Blasting

The platform

Software for rock

One record from the week's board to the customer's ticket. A hole is logged once, at the rig, and everything after it reads from that.

01 · Scheduling

The week, by site.

Crews and rigs go on one board, laid out by site. Publish it and everyone has the week: on their phone, and as a PDF in the company Slack.

  • Crews and equipment on the same board
  • Each person opens to their own days
  • The published week goes out as a PDF
Week of the 16thExample
Mon
Tue
Wed
Thu
Fri
North pit
Drill 1
Drill 1
Drill 1
Load
Shot
Ridge road cut
Drill 2
Drill 2
Load
Drill 2
Drill 2
Phase 2 lots
Drill 3
Drill 3
Drill 3

Published Friday 3:40 PM · 11 people

02 · Drill logs

Logged from the bench.

Drillers log each hole on a phone as it's drilled. The office watches the pattern fill in on a map, over the drone photo of the site.

  • Pattern, depth and notes for every hole
  • The map in 2D or 3D, over your own flight
  • On the phone the driller already carries
North pit · bench 3Example
Drilled
54 of 72
Today
8 holes
Pattern
12 × 14

Last hole E-6 · 38 ft · 2:14 PM

03 · Blast reports

The shot, on the record.

Loading, timing and vibration for every shot, entered once in the field and printed as the report.

  • Pounds per delay worked out from the tie-in
  • Seismograph readings kept with the shot
  • A reviewed report locks; a later edit takes a reason and is logged
Shot 26-031 · blast reportExample
Holes
142
Pattern
12 × 14 ft
Depth
38 ft
Volume
33,575 yd³
Powder factor
1.05 lb/yd³
Max per delay
248 lb

Seismograph · 640 ft

0.42 in/s peak

Reviewed

04 · Billing

Tickets ready to bill.

The field ticket is built from the shot's own holes, so the yards on the ticket are the yards that were drilled and shot.

  • Every hole on the ticket
  • Holes, depth, pattern and yards on the customer's copy
  • Re-shot holes stay off the bill
Field ticket · shot 26-031Example
ItemQtyUnit
Holes drilled and shot142ea
Depth38ft
Pattern12 × 14ft
Rock shot33,575yd³

12 × 14 × 38 ÷ 27 = 236.4 yd³ a hole × 142

Everything in the platform

Your instance

Under its own name

Bergbor stays in the background. Your crews open your instance, with your name, your mark and your colors on it.

Rocking P Blasting's is called Pop Rocks. Bergbor signs off in the footer.

Pop RocksA platform by
Runs on © 2026 Bergbor, Inc. · Terms · Privacy

Talk to us

Tell us how you run drilling and blasting today.

We'll walk you through the platform with your kind of work in mind.